Minor incident

Harness: Prod2: CV is failing with errors for all customers

Sep 29, 2026, 14:41 UTC
started
18:49 UTC
resolved
4 h 08 min
duration

Affected: Continuous Delivery - Next Generation (CDNG)

Current status of Harness: Operational — live Harness status

Timeline

  1. Sep 29, 2026, 14:41 UTC
    investigating
    We are currently investigating this issue.
  2. Sep 29, 2026, 15:54 UTC
    monitoring
    A fix has been implemented and we are monitoring the results.
  3. Sep 29, 2026, 15:57 UTC
    monitoring
    We are continuing to monitor for any further issues.
  4. Sep 29, 2026, 18:49 UTC
    resolved
    This incident has been resolved.
  5. Oct 2, 2026, 05:37 UTC
    postmortem
    **Summary** Customers on Prod-2 experienced elevated failure rates in Continuous Verification pipelines. Verification jobs failed to complete or reported errors because CV data-collection workers could not communicate with the platform service that coordinates their work. This was caused by an unexpected traffic spike to one of our backend systems. Service was restored by scaling out the affected platform component. No data loss or corruption occurred. ‌ **Customer Impact** Customers using Continuous Verification on Prod-2 saw verification pipeline jobs fail or time out during the incident window. A significant fraction of verification job instances that ran during this period ended in an operational failure. Pipelines not using CV continued to operate normally. ‌ **Root Cause** A large automated provisioning run created a significant number of persistent CV monitoring workers in a short window, which overwhelmed a shared platform component. The sudden increase in concurrent outbound calls exhausted the available network connections on each service instance. ‌ **Mitigation** The maximum scaling limit for the CV service was raised, allowing it to expand capacity to meet demand. Failures stopped shortly after the scale-out was completed. ‌ **Next Steps** To prevent recurrence, Harness will: * **Increase capacity headroom and add provisioning guardrails:** Raise the CV service scaling limit to maintain headroom under burst loads, and introduce rate limiting for bulk provisioning of monitored services. * **Improve Resiliency:** Add exponential backoff and jitter for worker retries, and use a reusable connection pool to reduce overhead and prevent transient failures from compounding under high concurrency. * **Improve monitoring and alerting:** Enhance alerting for abnormal per-account worker growth rates, so similar conditions are detected and acted on earlier.

Updates as published by Harness (original).

Other services with incidents at the same time

This was part of a wider event: 18 services reported incidents within the hour.

More Harness incidents