Major incident

University of Waterloo: East Campus 2 Third Floor Network Switch Maintenance - Outage

Apr 8, 2026, 17:28 UTC
started
12:00 UTC
resolved April 9, 2026
18 h 31 min
duration

Affected: Wireless Network, Wired Network

Current status of University of Waterloo: Minor issues — live University of Waterloo status

Timeline

  1. Apr 8, 2026, 17:28 UTC
    monitoring
    Network Services will be performing an emergency maintenance starting tomorrow at 6:30AM Thursday, April 9th until 8:00AM. The purpose of this maintenance is to address a bug and enhance stability. During this maintenance, there will be outage to both the wired and wireless networks on the third floor. However, disruptions are not expected to last the entire maintenance period.
  2. Apr 9, 2026, 12:00 UTC
    resolved
    Network Services will be performing an emergency maintenance starting tomorrow at 6:30AM Thursday, April 9th until 8:00AM. The purpose of this maintenance is to address a bug and enhance stability. During this maintenance, there will be outage to both the wired and wireless networks on the third floor. However, disruptions are not expected to last the entire maintenance period.

Updates as published by University of Waterloo (original).

Other services with incidents at the same time

More University of Waterloo incidents